Capacity
legacy
Capacity turned into good pieces · Yesterday · Shift A
67.6%
1,298 productive minutes of 1,920 available

Window closed and every RUN inspected. PCY is confirmed; nothing is provisional.

Where are we losing capacity?

602 minutes did not become good pieces.

  • 125
    min
    Waiting for a person6.5%
  • 120
    min
    Maintenance6.3%
  • 100
    min
    Nothing to print5.2%
  • 90
    min
    Waiting for material4.7%
  • 80
    min
    Offline or unknown4.2%
  • 52
    min
    Rejected pieces2.7%
  • 35
    min
    Plate and material changes1.8%
  • 20
    min
    Nobody knows1.0%

    No telemetry and no human record. Shown as is — never spread over the other lines.

How this number was calculated
  • L3IDLE-WAITING-HUMANWaiting for human125 minBed blocked after PRINT COMPLETE, error waiting to be cleared, confirmation pending.
  • L7MAINTENANCEMaintenance120 minPlanned or corrective maintenance windows.
  • L1IDLE-NO-WORKIdle · no work100 minMachine available, nothing assigned or nothing compatible to run.
  • L2IDLE-NO-MATERIALIdle · no material90 minWork exists, material not loaded / not available on the machine.
  • L8OFFLINE-UNKNOWNOffline / unknown80 minMachine not connected, telemetry missing, or piece result never known.
  • L6REWORK-SCRAPRework / scrap52 minEquivalent capacity of pieces that did not pass QC.
  • L4SETUP-CHANGEOVERSetup / changeover35 minPlate swap, material change, calibration between RUNs.
  • L5FAILUREFailure0 minRUN aborted or failed; minutes spent on it before the failure.

67.6% + 31.4% + 1.0% = 100.0%

Accepted
1298 min
Estimated (QC pending)
—
Provisional (RUN open)
—
Unaccounted
20 min

How each printer did

4 printers counted for Yesterday · Shift A.

  • U1-04
    50.0%

    Lost 90 min (19% of its day) — mostly waiting for material.

    Main loss: Waiting for material
  • U1-03
    62.5%

    Lost 120 min (25% of its day) — mostly maintenance.

    Main loss: Maintenance
  • U1-02
    69.4%

    Lost 50 min (10% of its day) — mostly nothing to print.

    Main loss: Nothing to print
  • U1-01
    88.5%

    Lost 25 min (5% of its day) — mostly waiting for a person.

    Main loss: Waiting for a person

U1-04 is the one pulling the farm down. Lost 90 min (19% of its day) — mostly waiting for material.

Only pieces a person accepted count as production. A finished plate still on the bed is waiting time, not output. Machines count from the moment they are registered; removing one from the calculation is an explicit human action, never an inference.