RUN-004821
Closed · QC recordedplate 25 of 25Cloud synchronized · 0 min oldLast plate of JOB-4821. Collected and inspected at 07:52 — 25 pieces rejected across the job.
- JOBJOB-4821
- →
- PARTART-RA-01 · Right Arm
- →
- VARIANTART-RA-01-V2
- →
- FILEFILE-0091-v3
- →
- MACHINEU1-02
Result · QC recorded
bed freedeficit 6- 34 good → stock ART-RA-01 7 → 41 — entered now, on QC accepted; never before.
- 6 scrap — never stock; material consumed and lost; counts against PCY this shift. Layer shift · Warping / lifted corner
- Bed free · U1-02 available · JOB-206 can start. This — not the print finishing — is what made the machine available.
JOB-4821 closes at 975/1000 good · 25 missing on NEED-2207 · target Mon 8 Sep 08:00. PLAN does not change anything by itself: a reprint is a new need and the board proposes a machine only after you ask.
Execution
Printingbed: Occupied / UnknownProduction counts · this run
recordedJob JOB-4821 cumulative: 975/1000 good · 25 scrap · deficit 25.
Produced is written only from a human count or a validated object-level signal. Scrap is material lost (PCY); Unproduced is capacity never realised; UNKNOWN is neither — and never zero.
Objects
no object levelFILE-0091-v3 is flat G-code with no Object Manifest, so the object level does not exist for this run. Counting happens at run level with human confirmation; scrap is counted, never located. Partial reprint is not available.
Run timeline
append-only- 01:38Run started · JOB-4821 · plate 25 of 25 · U1-02
- 07:48Print complete · G-code finished · 340 layers
- 07:48Bed occupied · machine NOT available
- 07:52Something is wrong · Caio · 40 collected · 34 accepted · 6 scrap
- 07:52Bed free · U1-02 available · JOB-206 started 08:04
- 07:52Stock · ART-RA-01 · +34 good · 7 → 41
- 07:55Print Again · REPRINT · RUN-004821 · 25 pcs · NEED-2207-R1
- 07:56PLAN proposed · JOB-216 → U1-01 after JOB-207 (SD-0919)